Yidong Coal Mine Intelligent Construction Data Center Equipment Procurement
Release time:
2024-03-21 14:29
Source:
Big banyan tree
Project Name: Yidong Coal Mine Intelligent Construction Data Center Room Equipment Procurement and Project Implementation
Procurement method: competitive negotiation
Purchaser: Tiandi (Changzhou) Automation Co., Ltd.
Supplier qualification requirements:
1. A legal person or other organization registered within the territory of the People's Republic of China and having the capacity to independently bear civil liability.
2, has a good business reputation and a sound financial accounting system.
3, with the necessary equipment and professional and technical capabilities to perform the contract.
4. In the last three years, there has been no major violation of law, discipline, deception, fraud or bad record in business activities.
5. The supplier participating in the negotiation is the equipment manufacturer or has the original sales license and authorization certificate. See the technical agreement for the specific requirements of the sub-system.
I. Project Scope
Tiandi (Changzhou) Automation Co., Ltd. (hereinafter referred to as "Party A") and the company (hereinafter referred to as "Party B") have fully negotiated the following agreement on issues related to the construction of the intelligent construction data center computer room (hereinafter referred to as the "Project") of Yidong Coal Mine. This technical agreement is used for the technical requirements of the research and development, supply, installation and commissioning of the intelligent construction data center computer room project of Yidong Coal Mine. This Agreement is an integral part of the Contract and has the same legal effect as the Contract.
II. General Requirements
2.1 System Overview
One set of integrated modular computer room will be built, which consists of 15 42U high 19 'cabinets, 1 integrated UPS cabinet, 2 Shante 40KW precision air conditioners and cold and hot channel components. The built-in rack Lingxiao UPS is integrated with refrigeration system, power distribution system, wiring system, lighting system and power environment monitoring system.
The system of this scheme has built-in rack-mounted UPS, rack-mounted output power distribution unit and rack-mounted air conditioner, which occupies a small installation space and the system occupies an extremely compact space. The installation method of placing the precision air conditioner and the server cabinet side by side and the hot and cold channel technology are adopted, which greatly reduces the air supply and return air path and resistance of the air conditioner, and avoids the mixing of hot and cold air flow, so the air conditioner can achieve the highest cooling efficiency.
General requirements:
The cold and hot channels are fully enclosed, with low dependence on the environment, noise and dust isolation, and more efficient use of cold energy, lower PUE, average PUE1.35
Industry innovative intelligent pop-up design, efficient response to the risk of refrigeration failure
Opening the door can be manually rotated to open the door, or the screen can be clicked to open the door, which does not affect each other and is more intelligent.
The air conditioner supports low-load dehumidification function, greatly reducing the risk of condensation in the cabinet at the beginning of the business.
Full modular design, rack installation, expansion easier
Supports stand-alone, N 1 redundant, 2N redundant multiple configurations
LCD touch capacitive screen, display comprehensive rich, smooth and fast operation, strong sense of experience
Standard cascade cabinet, split air conditioning design, for relatively high load occasions
Pre-set wiring system, saving on-site installation time and convenient follow-up maintenance
Strong and weak current wiring is clear, with strong current wiring rack on one side of the cabinet and weak current wiring slot on the other side.
Thiel certification, seismic certification, CCC certification, environmental certification and other certification.
2.2 system function
1, to ensure that the layout of the computer room is reasonable, comfortable and pleasant (to meet the "man-machine coexistence");
2. Ensure the operating environment of IT equipment, and the temperature, humidity and cleanliness meet the standard requirements of the computer room;
3, to ensure high reliability, high stability of the electrical system, fully guarantee the safe operation of IT equipment;
4, to ensure the computer room management staff efficient, centralized and intelligent working environment;
5. Ensure that the indicators of power and environment-related parameters of the computer room meet the requirements of "GB 50174-2017" Code for Design of Data Centers.
6, reduce costs, improve server resource utilization. The use of cloud platform technology to achieve server consolidation, can control and reduce the number of physical servers, can significantly improve the utilization of physical servers and their CPU, thereby reducing hardware costs.
7, improve the reliability of business systems. Through the cloud platform dynamic hot migration, load balancing strategy, host high availability (HA) and other advanced functions, combined with the redundancy mechanism of the business system itself, data and information migration can be carried out without interrupting the operation of the system. This can greatly improve the reliability of system operation.
8. Realize the rapid deployment of business systems and dynamically expand resources. Through the cloud platform, managers proactively plan for resource growth in advance, accelerate the deployment of new servers and applications, and shorten server reconstruction and application loading time.
9. Improve operational efficiency and service levels. Managers can use the unified and centralized resource monitoring and management, data analysis and visualization functions of the cloud platform to make more scientific auxiliary operational decisions, and ultimately achieve the purpose of improving operational efficiency and service levels.
2.3 main equipment parameters
1. High-end server cabinet
The high-end server cabinet is made of SPCC high-quality steel plate, and the surface is electrostatically sprayed with high-temperature baking process, which is of high quality and durability. The main frame is made of 7-fold G-bending process, and the external 6 beams are designed and manufactured. The through hole area reaches 76%. The front and rear doors are all made of alloy mixed handle locks, equipped with high-strength concealed hinges, and the whole cabinet is elegant and generous. The configuration is as follows:
(1)4 adjustable 2.0/EAI standard columns;
(2) The detachable top plate and the combined bottom plate are all reserved for line inlet holes, and are blocked by fireproof and flame retardant plastic cover plates;
(3) The front door comes standard with A- type flat high-density mesh door; The rear double-opening high-density mesh flat door;
(4) The door body adopts high-strength hanging hinge, which is convenient for disassembly and assembly;
(5) Standard PDU mounting plate;
(6) The static load-bearing capacity of the cabinet body is 2400KG, the dynamic load-bearing capacity is 1000KG, and the seismic crack of the cabinet frame is up to grade 8-9;
(7) color: fine sand black RAL9005.
2. Integrated UPS
3A3 PT 125kW (maximum 51 modules) power distribution integrated cabinet, 600mm * 1100mm * 2000mm, one mains input and IT output are UPS homologous two channels. IT power distribution: 1P/32A * 48, air conditioning power distribution: 3P/63A * 6, lighting moving ring: 1P/32A * 6.
25kW power module, including rectifier, battery converter, inverter and independent controller. A single UPM with hot-plug capability can operate independently and on-board without being affected by other UPM states.
UPS is equipped with three groups of battery cabinets with a load of about 7500KG. The on-site load-bearing situation should be considered in advance. The battery cabinets are deployed beside the communication room and cover an area of about 4.5 square meters.
3. Cabinet air conditioner
Air-cooled, constant temperature and humidity line-level precision air conditioner, horizontal air supply, DC inverter compressor, refrigerating capacity: 40.97kw, air volume: 7560 m3/h,EC fan, PTC heating 6kw, wet film humidification 1.5 kg/h,R410A refrigerant, 7-inch all-Chinese touch screen.
4、Moving ring monitoringAll-in-one machine
(1) Metal body, 10.1-inch touch screen, not occupying U position of rack, cabinet door installation
(2) Embedded industrial processor, 1.8GHz main frequency, quad-core cortex A17,2GB memory, 8G/16G storage space
(3) The system supports PDU, PDM, temperature and humidity sensor, BMS, fire unit, camera, flooding, smoke and other power environment equipment.
(4) rich interface:
(5)Linux operating system, open source is not limited, safe and reliable.
(6) The local monitoring interface is intuitive, simple to operate, built-in software, no need to install.
(7) Support online configuration, no need to use additional configuration tools to facilitate on-site debugging.
(8)B/S architecture, direct Web remote access, no need to install the client.
(9) Support mobile phone APP (currently only supports Android).
(10) It has the functions of PUE detection, calculation and display at the micro-module level, and displays the PUE value of the micro-module in the form of a data dashboard.
(11) smooth interface switching without obvious stuck, data refresh <3S.
(12)ETN cyber security认证
5. Input and output distribution box
(1)19 'national standard rack installation, height 3U-16U (different specifications according to user requirements). Sheet metal material using SPCC1.2-2.0
(2) EATON, a well-known brand for empty brand
(3) The front operation and rear wiring are adopted, which is convenient and safe to operate.
(4) Standard C- class lightning protection, standard monitoring of main circuit input power parameters, RS485 communication, monitoring host can directly read parameters
(5) The style is unified with other modules, and each branch indication and back-end terminal are clearly defined and clear at a glance.
6. Lightning protection and grounding
According to the requirements for grounding in Code for Design of Electronic Information System Room (GB 50174-2008), protective grounding and functional grounding should share a set of grounding devices, and the grounding resistance should be determined according to the minimum value. The ground wire of the project uses the building joint ground wire, and its grounding resistance is required to be less than 1Ω.
III. Supply List
Serial Number | Equipment Name | Specifications and models | Unit | Quantity | Manufacturer |
I. Cabinet | |||||
1 | High-end server cabinet | SMAR61242-A/K | Taiwan | 15 | Shante |
2 | Depth patch | SMAR6120-UP | Sleeve | 1 | Shante |
3 | 2-section side plate (pair) | SMARA1220SD | Right. | 3 | Shante |
4 | Vertical wiring board | SMARA0720UA | One | 15 | Shante |
2. Channel Component Product List | |||||
1 | 1U Airflow containment blind | SAMS1901B | Article | 150 | Shante |
2 | 2U Airflow Containment Blank | SAMS1902B | Article | 30 | Shante |
3 | Multi-function sunroof kit | SAMSFX61226-UT. | Sleeve | 7 | Shante |
4 | Steel Fixed Sunroof Kit | SAMSFX61226-F | Sleeve | 2 | Shante |
5 | One-key reset electric kit | SAMSALOCK-01M | Sleeve | 1 | Shante |
6 | C6-double open manual sliding door | SAMSX10MT2012 | Sleeve | 2 | Shante |
7 | Channel Accessories | SAMSACS-02P | Sleeve | 2 | Shante |
8 | Lighting radar sensor | SAMSTPY-DR03 | Piece | 2 | Shante |
9 | Warning Floodlighting | SAMSLED02 | Piece | 2 | Shante |
10 | Channel integrated control box | SAMSPCB405BX | Taiwan | 1 | Shante |
11 | Line accessories | SAMSSL-2M30PB | Sleeve | 1 | Shante |
12 | LED large three-color screen | SAMSAD-LED1 | Piece | 1 | Shante |
13 | Accessories | SAMSAS-LOGO | Sleeve | 2 | Shante |
14 | Telescopic straddle trunking | SAMSGES3030W | Piece | 2 | Shante |
15 | 600 wide strong and weak current tank | SAMSGES18M60 | Piece | 18 | Shante |
16 | 24-bit GB socket PDU | SMP-A32206-046-L | Piece | 30 | Shante |
Integrated UPS | |||||
1 | Integrated UPS | 3A3 PT 125K Frame SF-3SW for MDC | Taiwan | 1 | Shante |
2 | UPS module | 3A3 PT 25K UPM Rev B | One | 4 | Shante |
3 | UPS Card | Network & Modbus-MS | One | 1 | Shante |
4 | Castle Battery | BAT SHAN TE C12-200 12V 200AH | Section | 120 | Shante |
IV. Air Conditioning | |||||
1 | Indoor unit (40kw) | SMCRC12040P | Taiwan | 2 | Shante |
2 | Air conditioning external unit | SMC676 | Taiwan | 2 | Shante |
3 | Air conditioning accessories |
| Item | 2 | Shante |
5. moving ring monitoring | |||||
1 | 21.5 inch industrial flat panel monitor | STKMNT-TD21.5E | Taiwan | 1 | Shante |
2 | Intelligent integrated monitoring host (Linux platform) | STKMNT-IMU2000-AISLE | Taiwan | 1 | Shante |
3 | MDC monitoring software (independent monitoring version) | STKMNT-SWMNT01 | One | 1 | Shante |
4 | 4G SMS Module | STKMNT-4GSMS | One | 1 | Shante |
5 | 8 Gigabit POE network switch | STKMNT-S1208V-PWR | Taiwan | 1 | Shante |
6 | Intelligent temperature and humidity sensor (with LCD display) | STKMNT-THD-485 | One | 2 | Shante |
7 | Regional water leakage adapter module (including 7.5 m water leakage rope) | STKMNT-SJL2-7.5 | One | 2 | Shante |
8 | Smoke detector | STKMNT-YG2 | One | 2 | Shante |
9 | Audible and visual alarm | STKMNT-ES603 | One | 1 | Shante |
10 | double-door network access controller | STKMNT-806-M28 | One | 1 | Shante |
11 | Dedicated power supply | STKMNT-HDR-100-12N | One | 1 | Shante |
12 | Fingerprint Reader | STKMNT-NF18 | One | 2 | Shante |
13 | IC Card | STKMNT-ICC | Zhang | 10 | Shante |
14 | Infrared dome camera (POE) | STKMNT-2CD2325V3-I | One | 2 | Shante |
15 | 4-way hard disk video recorder | STKMNT-7604N-E1-V3 | Taiwan | 1 | Shante |
16 | 2T monitoring hard disk | STKMNT-ST2000VX000 | One | 1 | Shante |
17 | Install auxiliary package | STKMNT-ASY01 | Sleeve | 1 | Shante |
Lightning protection and grounding of 6. machine room | |||||
1 | Grounding bus bar |
| Meters | 100 | National Standard |
2 | Ground wire |
| Meters | 200 | Domestic high quality |
3 | Main grounding wire |
| Meters | 100 | Domestic high quality |
4 | Equipotential terminal box |
| Sleeve | 2 | Domestic high quality |
5 | Dual power switch cabinet |
| Sleeve | 1 | Domestic high quality |
6 | Installation and commissioning |
| Item | 1 | Domestic high quality |
Gas fire extinguishing engineering system for 7. machine room | |||||
1 | 140L cabinet type heptafluoropropane gas fire extinguishing device | GQQ140/2.5-ZTQ-I | Taiwan | 1 | Beida Bluebird |
2 | Automatic pressure relief device | XYJ/0.25-ZTQ | Sleeve | 1 | Beida Bluebird |
3 | point type photoelectric smoke detector | JTY-GD-JBF-5100 | Only | 8 | Beida Bluebird |
4 | Point-type heat-sensing fire detector | JTW-ZD-JBF-5110 | Only | 8 | Beida Bluebird |
5 | Detector base | JBF-VB4301B | Only | 16 | Beida Bluebird |
6 | Audible and visual alarm | JBF5176A | Only | 1 | Beida Bluebird |
7 | Alarm bell | HY2114 | Only | 1 | Beida Bluebird |
8 | Emergency start-stop button | JBF5184 | Only | 1 | Beida Bluebird |
9 | Bleed light | JBF5180 | Only | 1 | Beida Bluebird |
10 | Gas fire extinguishing controller control system | JB-QB-JBF-51S04 | Taiwan | 1 | Beida Bluebird |
Relocation of old equipment room in 8. | |||||
1 | Auxiliary Materials for Relocation of Old Computer Room |
| Batch | 1 | Domestic |
The technical agreement includes the relocation of the old machine room equipment (including installation), and the required auxiliary materials shall be provided by Party B. | |||||
(c) Other requirements.
See Technical Agreement for details
V. Business Requirements
Payment method:(1) after the installation and commissioning are completed and the acceptance is qualified; According to the acceptance report signed by relevant departments, the buyer shall pay 90% of the total contract amount, and the remaining 10% shall be used as the warranty fund, which shall be paid after the expiration of the warranty period. Acceptable for 12 months.
(2) Our framework agreement suppliers are required to respond to the long-term agreement payment method.
Warranty period: 1 year from the date of acceptance.
Delivery date: complete installation and debugging before February 29, 2023, and operate normally.
Qualification requirements: provide relevant authorization certificates, enterprise-related qualification certificates, technical solutions and enterprise introduction. (Submit three documents and bind them into a book, which needs to be checked on site).
Follow-up service: the supplier shall provide relevant service items after the expiration of the follow-up warranty.
Quotation sheet: quotation paper (sealed), electronic copy in U disk each, the overall quotation for the full package price.
Quotation content requirements: the quotation content includes equipment costs, commissioning fees, implementation fees (artificial auxiliary materials) and other all-inclusive prices. This quotation should fully respond to the requirements of our company's technical agreement.
Time and place of negotiation: 09:00 a.m. on December 19, 2023 to our company (specific conference room will be notified separately)
Business Contact: Liang Xu Tel 15906120515
Technical contact: Zhu Tao Tel 13961292196