Announcement on Procurement of Construction and Network Operation Services of Communication Center of Guangzhou Power Supply Bureau


Project Name: Bidding Announcement for Procurement Framework of Communication Construction and Network Operation Services of Guangzhou Power Supply Bureau Communication Center from 2024 to 2025

I. Conditions of Bidding

This tender project is 2024 to 2025 Guangzhou Power Supply Bureau Communication Center Communication Construction and Network Operation Service Procurement Framework, the tenderer is Guangdong Power Grid Co., Ltd. Guangzhou Power Supply Bureau, the project funds from self-financing, the proportion of capital contribution is 100. The project has already met the bidding conditions, and now the project is subject to public bidding.

II. Project Overview and Scope of Bidding

(I) Project overview:

Target 1: Provide wireless network equipment transformation and construction services for the communication center during the validity period of the framework.

Target 2: Provision of communication centres during the validity period of the frameworkMoving ring monitoringEquipment renovation and construction services, including installation and commissioning of moving ring monitoring equipment, relevant cable laying and business cutover.

Target 3: To undertake the communication center power equipment transformation and construction services, including power equipment installation, commissioning, testing, related cable laying and business cutover.

Target 4: To undertake the transformation and construction services of air-conditioning equipment in the communication center, including the installation and commissioning of air-conditioning equipment and the laying of related cables.

Target 5: Provide communication center communication room overhaul project construction services, communication room related transformation construction within the validity period of the framework.

Target 6: Within the validity period of the framework, we will provide communication transformation and construction services for the whole station of the communication center, including installation and commissioning of communication equipment, laying of related cables and business cutover; installation and testing of power supply and auxiliary equipment, decoration of computer rooms and other communication professional types.

Target 7: Provide communication center transmission equipment transformation and construction services during the validity period of the framework, including transmission equipment installation, commissioning, related cable laying and business cutover.

Target 8: Provide communication center data equipment and voice switching equipment transformation and construction services during the validity period of the framework, including data equipment and voice switching equipment installation, commissioning, related cable laying and business cutover.

Target 9: This item is a tender for service units for the electronic transfer of services for other types of infrastructure projects in the Communication Center in 2023-2024. The bidding includes:

(1) Collection and arrangement of equipment data, including the collection of design data of project equipment by the design unit and the collection of on-site construction data by the construction unit;

(2) the establishment of equipment ledger, according to the design unit and the construction unit to provide information for infrastructure engineering equipment ledger structure and parameter entry;

(3) Follow up the audit process of equipment ledger, follow up and revise the audit process of supervision unit, project manager and operation unit stage ledger handover;

(4) The electronic ledger of the financial system equipment asset card is added, updated, revised, deleted and other maintenance work.

Target 10:2023-2024 Communication Center Production Test Equipment Inspection Framework.

Target 11: Provide technical support for the maintenance of integrated data network equipment and network management of the communication center during the validity period of the framework, and provide the following technical support services at the station by professional and technical personnel:

1) Assist to complete the daily operation and maintenance of integrated data network equipment (including inspection, regular inspection, etc.);

2) Assist in the preparation of maintenance plan, operation mode adjustment and network optimization of integrated data network;

3) Assist in the network management operation of the integrated data network in combination with the work requirements of the mode list, maintenance list, defect list, safety reinforcement, etc;

4) Assist in handling equipment and network troubleshooting and business recovery, analyze hidden dangers, assist in handling hidden dangers, prepare inspection reports and formulate prevention and control measures;

5) For the defects of the equipment, assist in the detection and debugging of faulty equipment and boards; Synchronously upgrade the software version and security vulnerabilities of the equipment;

6) Regularly check the operation of the integrated data network management system and flow monitoring system to ensure the normal functions and maintain the freshness of the data.

7) Cooperate and guide the independent maintenance of communication, and build the data network simulation model.

Target 12: During the validity period of the framework, the communication center will provide technical support for dispatching data network equipment and network management maintenance, and professional and technical personnel will be stationed to provide the following technical support services:

1) Assist to complete the daily operation and maintenance of dispatching data network equipment (including inspection, regular inspection, etc.);

2) Assist in the preparation of maintenance plan, adjustment of operation mode and network optimization of dispatching data network;

3) Assist to carry out the network management operation of dispatching data network in combination with the work requirements such as mode list, maintenance list, defect list, safety reinforcement, etc;

4) Assist in handling equipment and network troubleshooting and business recovery, analyze hidden dangers, assist in handling hidden dangers, prepare inspection reports and formulate prevention and control measures;

5) For the defects of the equipment, assist in the detection and debugging of faulty equipment and boards; Synchronously upgrade the software version and security vulnerabilities of the equipment;

6) Regularly check the operation of the dispatching data network management system (including the dispatching data network integrated network management and SDN network management system) to ensure the normal functions and maintain the freshness of the data.

7) Cooperate and guide the independent maintenance of communication, and build the data network simulation model.

Target 13: Provide technical support for the communications service desk of the communications center during the validity period of the framework, and assign professional personnel to provide technical support for the work of the communications service desk, including:

1) Answer the communication service desk hotline, be responsible for accepting non-productive communication barriers, resource applications, user complaints and other issues, and follow up the business or problem document process;

2) Responsible for the maintenance and technical support of the "South Netcom" unified communication system within the Guangzhou Bureau, and the use and promotion of the South Netcom system.

Target 14: Provide technical support for the network security protection of the communication system of the communication center during the validity period of the framework, and provide the following technical support services at the station of professional and technical personnel:

1) For the main station and sub-station equipment of the communication center and the subsequent newly added equipment, according to the requirements of the South Network and information security level protection, provide equipment daily inspection, special inspection, performance tuning, firmware upgrade, anti-virus, security reinforcement, strategy improvement services and function expansion, fault repair and other services.

2) Provide technical support and on-site 7 × 24-hour station support during the 2024 network protection operation.

3) Two-year license authorization renewal (one year renewal) for 7 network security devices provided to the main station of the communication center.

Target 15: Provide communication center communication operation control system maintenance during the validity period of the framework, arrange professional on-site station service, provide on-site rapid technical services, mainly including:

1) For the communication operation control system of the communication center, upgrade the version of each module of the system in time, complete the optimization, adjustment and defect treatment of each module function in time, and ensure the safe and stable operation of the operation control system.

2) For the data generated by infrastructure construction, overhaul and technical renovation projects and daily production and maintenance, electronic sorting and data entry shall be carried out according to the format requirements of the operation control system, normative inspection of system data and consistency comparison of ledgers shall be completed regularly, on-site data verification shall be carried out with teams and groups, and incremental and existing logical data shall be updated, maintained and verified, and data correction shall be completed in time, ensure that system resource data is updated in a timely and accurate manner.

Target 16: Within the validity period of the framework, complete the digitization of archives and archival arrangement of the communication center construction project, including the electronization of project archives, archival arrangement, coordination with archival inspection, and standardized management of archives.

Target 17: Within the validity period of the framework, complete the occupational health environment assessment service of the Communication Center, including: occupational health environment assessment of the substation room under the jurisdiction of the Communication Center.

(II) Scope of Bidding:

Target 1: During the validity period of the framework, provide wireless network equipment transformation and construction services for the communication center.

Target 2: Provide communication center dynamic ring monitoring equipment transformation and construction services during the validity period of the framework, including dynamic ring monitoring equipment installation, commissioning, related cable laying and business cutover.

Target 3: During the validity period of the framework, provide power equipment transformation and construction services for the communication center.

Target 4: During the validity period of the framework, provide air-conditioning equipment transformation and construction services for the communication center.

Target 5: Provide communication center communication room overhaul project construction services, communication room related transformation construction within the validity period of the framework.

Target 6: Within the validity period of the framework, we will provide communication transformation and construction services for the whole station of the communication center, including installation and commissioning of communication equipment, laying of related cables and business cutover; installation and testing of power supply and auxiliary equipment, decoration of computer rooms and other communication professional types.

Target 7: Provide communication center transmission equipment transformation and construction services during the validity period of the framework, including transmission equipment installation, commissioning, related cable laying and business cutover.

Target 8: Provide communication center data equipment and voice switching equipment transformation and construction services during the validity period of the framework, including data equipment and voice switching equipment installation, commissioning, related cable laying and business cutover.

Target 9: During the validity period of the framework, the new, updated, revised, deleted and maintained the electronic data of equipment ledger and financial system equipment asset cards after the completion of other types of infrastructure projects of the communication center, and the provision of services for the electronic transfer of other types of infrastructure projects of the communication center.

Target 10: During the validity period of the framework, the production of test equipment testing services for the communication center.

Target 11: During the validity period of the framework, technical support for the maintenance of integrated data network equipment and network management of the communication center, project requirements see technical specifications.

Target 12: During the validity period of the framework, dispatch data network equipment and network management maintenance technical support for the communication center. See the technical specification for the project requirements.

Target 13: During the validity period of the framework, technical support for the communication service desk of the communication center, the project requirements are shown in the technical specification.

Target 14: During the validity period of the framework, for the communication center communication system network security protection technical support, project requirements see technical specifications.

Target 15: During the validity period of the framework, the communication operation control system of the communication center is maintained, and the project requirements are shown in the technical specification.

Target 16: Complete the digitization and archival work of the communication center construction project within the validity period of the framework.

Target 17: Within the validity period of the framework, complete the occupational health environment assessment service of the Communication Center, and see the technical specification for the project requirements.

(III) Location of Bidding Project: Guangzhou.

(IV) qualification examination method: post-qualification examination.

(5) Tender classification: framework tender.

(vi) Validity period of framework tenders (applicable to framework tenders):

Subject 1, 2, 5, 6, 7, 8, 9, 16: from the effective date of the contract to December 31, 2025;

Subject matter 3, 4, 10, 11, 12, 13, 14, 15, 17: from the effective date of the contract to December 31, 2024.

The list of (VII) objects and subcontracts is as follows:

Serial Number

Subject Code

Subject

Estimated amount (ten thousand yuan)

Package coding

Package No.

Package Name

Package amount (ten thousand yuan)

Bid bond (ten thousand yuan)

Maximum price ($million)

Limit Price Description

Service Period/Duration

Network security review required

1

CG2700022001638497001

Target 1: Communication Center Wireless Network Construction Framework from 2024 to 2025

600

CG2700022001638497001001

1

Bid Package 1: Wireless Network Construction Framework of Communication Center from 2024 to 2025

600

/

/

/

Subject to the signing of the contract

No

2

CG2700022001638497002

Target 2:2024 to 2025 communication center dynamic ring monitoring equipment transformation construction framework

200

CG2700022001638497002001

1

Bid Package 1: Construction Framework for Transformation of Moving Ring Monitoring Equipment in Communication Center from 2024 to 2025

200

/

/

/

Subject to the signing of the contract

No

3

CG2700022001638497003

Target 3: Construction framework for power transformation of communication center from the second half of 2023 to the end of 2024

510

CG2700022001638497003001

1

Bid Package 1: Construction Framework for Power Transformation of Communication Center from the Second Half of 2023 to the End of 2024

510

/

/

/

Subject to the signing of the contract

No

4

CG2700022001638497004

Target 4: Construction framework for air conditioning renovation of communication center from 2023 to 2024

300

CG2700022001638497004001

1

Bid Package 1: Construction Framework for Air Conditioning Renovation of Communication Center from 2023 to 2024

300

/

/

/

Subject to the signing of the contract

No

5

CG2700022001638497005

Target 5: Communication Center Communication Room Overhaul Framework from 2024 to 2025

300

CG2700022001638497005001

1

Bid Package 1: Communication Center Communication Room Overhaul Framework from 2024 to 2025

300

/

/

/

Subject to the signing of the contract

No

6

CG2700022001638497006

Target 6: Construction framework for communication transformation of communication center station from 2024 to 2025

160

CG2700022001638497006001

1

Bid Package 1: Construction Framework for Communication Transformation of Communication Center Station from 2024 to 2025

160

/

/

/

Subject to the signing of the contract

No

7

CG2700022001638497007

Target 7: Construction framework for the transformation of transmission equipment in the communication center from 2024 to 2025

100

CG2700022001638497007001

1

Bid Package 1: Construction Framework for Transformation of Transmission Equipment in Communication Center from 2024 to 2025

100

/

/

/

Subject to the signing of the contract

No

8

CG2700022001638497008

Target 8:2024-2025 communication center data equipment and voice switching equipment transformation construction framework.

100

CG2700022001638497008001

1

Package 1: Construction Framework for Transformation of Data Equipment and Voice Switching Equipment in Communication Center from 2024 to 2025

100

/

/

/

Subject to the signing of the contract

No

9

CG2700022001638497009

Target 9: Electronic handover services for other types of communication center infrastructure projects from 2024 to 2025

106

CG2700022001638497009001

1

Bid Package 1: Electronic Handover Service for Other Infrastructure Projects of Communication Center from 2024 to 2025

106

/

For unit price limit, see the Quotation Table for details.

/

Subject to the signing of the contract

No

10

CG2700022001638497010

Target 10:2023-2024 Communication Center Production Test Equipment Inspection Framework

30

CG2700022001638497010001

1

Package 1:2023-2024 Communication Center Production Test Equipment Inspection Framework

30

/

For unit price limit, see the Quotation Table for details.

/

Subject to the signing of the contract

No

11

CG2700022001638497011

Target 11:2024 Communication Center Integrated Data Network Equipment and Network Management Technical Support.

99

CG2700022001638497011001

1

Package 1:2024 Communication Center Integrated Data Network Equipment and Network Management Technical Support

99

/

For unit price limit, see the Quotation Table for details.

/

Subject to the signing of the contract

No

12

CG2700022001638497012

Target 12:2024 Communication Center Dispatching Data Network Equipment and Network Management Technical Support

65

CG2700022001638497012001

1

Package 1:2024 Communication Center Dispatching Data Network Equipment and Network Management Technical Support

65

/

For unit price limit, see the Quotation Table for details.

/

Subject to the signing of the contract

No

13

CG2700022001638497013

Target 13:2024 Communication Center Communication Service Desk Technical Support

26

CG2700022001638497013001

1

Package 1:2024 Communications Center Communications Service Desk Technical Support

26

/

For unit price limit, see the Quotation Table for details.

/

Subject to the signing of the contract

No

14

CG2700022001638497014

Target 14:2024 Communication Center Communication System Network Security Protection Technical Support.

86

CG2700022001638497014001

1

Package 1:2024 Technical Support for Network Security Protection of Communication System in Communication Center

86

/

For unit price limit, see the Quotation Table for details.

/

Subject to the signing of the contract

No

15

CG2700022001638497015

Target 15:2024 Communication Center Communication Operation Control System Maintenance

87

CG2700022001638497015001

1

Package 1:2024 Communication Center Communication Operation Control System Maintenance

87

/

For unit price limit, see the Quotation Table for details.

/

Subject to the signing of the contract

No

16

CG2700022001638497016

Target 16: Digital Chemical Engineering and Archival Arrangement of Communication Center Project Archives from 2024 to 2025

60

CG2700022001638497016001

1

Bid Package 1: Digital Chemical Engineering and Archival Arrangement of Communication Center Project Archives from 2024 to 2025

60

/

For unit price limit, see the Quotation Table for details.

/

Subject to the signing of the contract

No

17

CG2700022001638497017

Target 17:2024 Communication Center Occupational Health Environment Assessment Service Project.

50

CG2700022001638497017001

1

Package 1:2024 Communication Center Occupational Health Environment Assessment Service

50

/

For unit price limit, see the Quotation Table for details.

/

Subject to the signing of the contract

No

Note: The estimated purchase amount is the demand forecast data, which is only used as the estimated scale of bidding for the reference of bidders. It does not represent the commitment of the tenderee to the purchase quantity and amount. In the end, the actual number of projects implemented during the validity period of the framework bidding and the actual settlement amount according to the contract terms shall prevail.

3. Bidder Qualification Requirements

General Qualification Requirements
Serial NumberContent
1The bidder is a legal person or other organization registered and legally operating within the territory of the People's Republic of China, and provides the certification documents for registration and establishment (such as: business license or business legal person registration certificate or practice license, etc.). Legal persons need to have the ability to independently assume civil liability and perform contracts independently; other organizations need to have the ability to perform contracts independently.
2Bidder did notChina Southern Power Grid Co., Ltd.Suspension of bidding qualification, cancellation of bidding qualification, non-acceptance of bidding, market ban, and not lifted.
3The bidder must complete the supplier registration on the unified supply chain service platform (www.bidding.csg.cn) in accordance with the requirements of China Southern Power Grid, and pass the audit.

 

SPECIAL QUALIFICATION REQUIREMENTS
Serial NumberContentAssociated Target/Package/Bid Section
1

1. Have one of the following effective qualifications: communication engineering construction general contracting qualification, construction engineering construction general contracting qualification, electronic and intelligent engineering professional contracting qualification, power transmission and transformation engineering professional contracting qualification;

2, have a valid "installation (repair, test) power facilities license";

3. Have a valid safety production license issued by the construction administrative department;

4. Consortium bids are not accepted.

Target 1: communication center wireless network construction framework from 2024 to 2025, target 2: communication center dynamic ring monitoring equipment renovation construction framework from 2024 to 2025, target 3: communication center power supply renovation construction framework from the second half of 2023 to the end of 2024, target 4: communication center air conditioning renovation construction framework from 2023 to 2024, target 5: communication center communication room overhaul framework from 2024 to 2025, target 6: construction framework for communication transformation of the whole station of the communication center from 2024 to 2025, target 7: construction framework for transformation of transmission equipment of the communication center from 2024 to 2025, target 8: construction framework for transformation of data equipment and voice switching equipment of the communication center from 2024 to 2025
2Consortium bids are not accepted.Target 9: Electronic handover services for other types of communication center infrastructure projects from 2024 to 2025
3

1. Have a valid "Laboratory Accreditation Certificate" issued by the China National Accreditation Service for Conformity Assessment (CNAS) or have a valid "Qualification Certificate for Inspection and Testing Institutions";

2. The project personnel have a valid qualification certificate of registered metrologist;

Note: The above personnel shall provide social security certificates for 3 consecutive months within 4 months before the deadline for bidding of the unit;

3. Do not accept the consortium bid,

Target 10:2023-2024 Communication Center Production Test Equipment Inspection Framework
4

1. Have a valid information technology service operation and maintenance standard conformity certificate (ITSS);

2. Consortium bids are not accepted.

Target 11:2024 Communication Center Integrated Data Network Equipment and Network Management Technical Support, Target 12:2024 Communication Center Dispatching Data Network Equipment and Network Management Technical Support
5

1. Have a valid "installation (repair, test) power facilities license" installation level 5 and above qualification or repair level 5 and above qualification;

2. Have a valid safety production license issued by the construction administrative department;

3. Have effective communication engineering construction general contracting level 3 and above, or power engineering construction general contracting level 3 and above, or power transmission and transformation engineering professional contracting level 3 and above qualifications;

3. Do not accept the consortium bid;

Target 13:2024 Communication Center Communication Service Desk Technical Support, Target 15:2024 Communication Center Communication Operation Control System Maintenance
6

1. Have a valid information security service certification (CCRC) one of them;

2. Consortium bids are not accepted.

Target 14:2024 Communication Center Communication System Network Security Protection Technical Support.
7

1. Have a valid file filing certificate or certification document issued by the provincial, municipal or local archives bureau;

2. Have effective state secret carrier printing qualification (classified archives digital processing category);

3. Consortium bids are not accepted.

Target 16: Digital Chemical Engineering and Archival Arrangement of Communication Center Project Archives from 2024 to 2025
8

1. Having valid Qualification Certificate of Occupational Health Technical Service Organization;

2. Have a valid Certificate of Qualification of Inspection and Testing Institutions;

3. The project personnel shall have a valid Certificate of Training for Professional and Technical Personnel of Occupational Health Technical Services.

Note: The above personnel shall provide the social security certificate for 3 consecutive months within 4 months before the deadline for bidding of the unit.

3. Do not accept the consortium bid,

Target 17:2024 Communication Center Occupational Health Environment Assessment Service Project.

IV. Acquisition of Bidding Documents

(I) Completion of supplier registration

The registration of suppliers of the supply chain unified service platform of China Southern Power Grid Corporation shall be completed before the deadline for the sale of bidding documents for this project (login website: www.bidding.csg.cn)(for details, please refer to the announcement of supplier registration of China Southern Power Grid Corporation published on the website on March 1, 2016). Please select "Guangdong Power Grid Co., Ltd." as the auditing unit when submitting the registration information, and the completed cost steps can be ignored. The supplier shall reserve sufficient time for registration and audit. If the supplier cannot obtain the bidding documents in time due to its own reasons, the consequences shall be borne by the supplier.

(2) Digital certificate processing

Complete the supplier's digital certificate processing before the deadline for submission of bid documents for this project (see the website download center digital certificate processing guide for the processing process). The completed steps can be ignored. The supplier shall reserve enough time for the digital certificate processing. If the supplier cannot bid due to its own reasons, the consequences shall be borne by the supplier.

(III) Acquisition of Bidding Documents

Log in to the unified service platform of the supply chain with the system account number and password, determine the items, targets and packages to be purchased, and download the electronic bidding documents stamped with the electronic seal of the bidding agency in the system.

(IV) Price of Bidding Documents (Electronic Documents)

The tender documents are priced at $0.

Time for (V) Supply Chain Unified Service Platform to Sell Bidding Documents

The supply chain unified service platform sells bidding documents from 17: 00: 00 on December 08, 2023 to 17: 00: 00 on December 14, 2023. Expired cannot be obtained.

(VI) supplier registration, supply chain unified service platform operation, digital certificate handling consultation telephone

Supplier registration consultation telephone number: 4008100100 to 1

Supply chain unified service platform operation consultation telephone number: 4008100100 to 3

Digital certificate for consultation telephone: 400-666-3999

Telephone consultation time: 8:30-12:00 a.m. and 14:00-17:00 p.m. from Monday to Friday

V. Submission of Bidding Documents

(I) Bid Submission Method

1. Submit the bidding documents through the supply chain unified service platform of China Southern Power Grid (www.bidding.csg.cn), and this shall prevail.

2. All-electronic paperless bidding is adopted in this bidding. Bidders must complete the uploading of bidding documents on the supply chain unified service platform of China Southern Power Grid Company according to the requirements of the bidding documents before the specified closing time. There is no need to separately produce and submit paper bidding documents and U disk electronic bidding documents. If the bidding documents are not produced or uploaded on the supply chain unified service platform of China Southern Power Grid Company as required, all consequences caused shall be borne by the bidder.

Time and deadline for submission of (II) bid documents

The bidding documents of the supply chain unified service platform will be submitted at 17: 00: 00 on December 08, 2023, and the deadline will be 09: 00: 00 on January 02, 2024.

(III) Bid bond

No bid bond is charged for this project.

(iv) Computer hardware signature review requirements

In order to further standardize bidding activities and maintain a fair and competitive market environment, the project strictly examines the computer hardware feature codes generated by bidders during the process of downloading bidding documents, making and uploading bidding documents. In case of any of the following circumstances, the bid evaluation committee shall reject the bid:

1. The IP address of the bidding documents downloaded by other bidders, the CPU serial number of the bidding documents and the serial number of the hard disk are consistent at the same time;

2. The IP address, CPU serial number and hard disk serial number of the bid documents uploaded by other bidders are consistent at the same time;

3. Consistent with the MAC address of the network card in the bidding documents of other bidders.

If any of the above situations occurs in the minimum independent evaluation unit (target/bid package/bid section) of the procurement project, all bid documents of the bidder responding to the procurement project and subsequent procurement of the same procurement project will be rejected.

If there is collusive bidding in the bidding documents, the relevant bidders will be punished for not accepting bids in accordance with the relevant regulations of China Southern Power Grid.

VI. Time and Place of Bid Opening

(I) bid opening time: 09: 00: 00 on January 02, 2024

(2) Location: China Southern Power Grid Supply Chain Unified Service Platform

Note: This tender adopts online bid opening, and there is no on-site bid opening link. At the same time, there is no need to submit the original paper-based bid guarantee on site before bid opening. After the bidder scans and uploads it to the system according to regulations, the original guarantee will be mailed to the designated address before the deadline for bidding (see the tender documents for details). The bidder can check the decryption of the project on the unified service platform of the supply chain of China Southern Power Grid within one hour after the bid opening, and complete the system confirmation. If it is not confirmed within the time limit, it will be deemed to agree with the bid opening result.

Seven, the media of the announcement.

This tender adopts the public bidding method, and the announcement is published in "China Public Service Platform for Tendering and Bidding (www.cebpubservice.com) and China Southern Power Grid Corporation Supply Chain Unified Service Platform (www.bidding.csg.cn).

VIII. Other Announcement Contents

According to the requirements of the national "network security review measures", the successful candidate/winning bidder has the obligation to cooperate with the network security review work for the products or services that need to be declared to the national network security review office by China Southern Power Grid Corporation. The required declaration materials shall be provided within 3 working days after receiving the notice from the tenderee, the convenience of providing products and services shall not be used to illegally obtain user data, illegally control and manipulate user equipment, and shall not interrupt the supply of products or necessary technical support services without justifiable reasons. The winning bidder can only be determined after the products and services pass the network security review. Those who fail to pass the network security review will be disqualified from winning the bid. All bidders participating in this bidding shall be deemed to have committed to the above matters, and the successful candidate/winning bidder shall bear the relevant responsibilities and consequences for the losses caused by the failure of the products and services of the successful candidate/winning bidder to pass the network security review obligations (including non-cooperation with the review, deliberate concealment, provision of false declaration materials, etc.) and cause direct or indirect losses to the tenderer, the tenderer reserves the right to be held accountable.

IX. Supervision Department

(1) If the bidder or other interested parties have doubts or objections to the prequalification documents (if any), bidding documents and bid evaluation results in the procurement process, they shall have the right to submit them to the tenderee through the bidding agency.

Name of Bidding Agency: China Southern Power Grid Supply Chain Group Co., Ltd;

Bidding Agency E-mail: nwwzeb1@csg.cn

(2) Bidders or other interested parties who believe that this procurement activity does not comply with the provisions of laws and administrative regulations shall have the right to complain to the following relevant departments.

Name of supervision and complaint institution: Asset Management Department of Guangzhou Power Supply Bureau

Supervision and Complaints Agency Tel: 020-87120056

E-mail of supervisory complaint bodies: gyljdts@guangzhou.csg.cn

X. Contact Information

Tenderee: Guangdong Power Grid Co., Ltd. Guangzhou Power Supply Bureau

Address: No. 2, Tianhe Henan Second Road, Tianhe District, Guangzhou

Contact: Liu Gong

Tel: 020-87122583

 

Bidding Agency: China Southern Power Grid Supply Chain Group Co., Ltd.

Address: 178 Tianhe Road, Tianhe District, Guangzhou

Contact: Yang Gong

Tel: 4008100100-2-0

Principal (Project Principal) of the Tenderee or its Tendering Agency: Xie Jianxin

December 08, 2023

 

Successful Cases